System Start-Up; Filling The System; Commissioning The System; Start Up The Control Panel - Buderus Logano G515 Installation And Service Instructions Manual

Low-temperature oil/gas boiler buderus logano g515
Hide thumbs Also See for Logano G515:
Table of Contents

Advertisement

11

System start-up

You can connect control panels of the 4000 series to the Logano G515.
The commissioning process for the different types of control panel is the
same.
NOTICE: The boiler can be damaged through heavy dust
deposits!
▶ Do not operate the boiler where heavy dust
contamination persists, e.g. through building work
inside the boiler room.
▶ Complete the commissioning log ( Chapter 11.6, page 37).
The pH value of the boiler water increases after the heating system has been filled. After 3 – 6 months (at the time of the first service), check whether
the pH value of the boiler water has stabilized.
Overall boiler output
MBH (kW)
341 < Q ≤ 1,194 (100 < Q ≤ 350)
1,194 < Q ≤ 3412 (350 < Q ≤ 1000)
341 < Q ≤ 1,194 (100 < Q ≤ 350)
1,194 < Q ≤ 3412 (350 < Q ≤ 1000)
Table 13 Requirements for fill, make-up and boiler water
3
1) 1 ft
= 7.48 gal
11.2

Commissioning the system

Observe the following when commissioning:
▶ Purge the air from your heating system via its radiators prior to
commissioning.
▶ Check that the hot gas baffle plates are inserted correctly
( Chapter 7.8.5, page 22).
Fig. 67 Check position of heat exchanger baffles
Logano G515 – 6 720 647 208 (2014/09)
Ca (HCO
)
concentration /
3
2
1)
grains per gallon
(ppm)
≤ 11.7 (≤ 2.0)
≤ 8.8 (≤ 1.5)
> 11.7 (> 2.0)
> 8.8 (> 1.5)
720 42 23- 4.1o
11.1

Filling the system

NOTICE: Risk of system damage from temperature
stresses.
▶ During operation, only fill the heating system via the
fill valve on the system side (return).
Refer to the table below for information about correct use and treatment
of the fill and make-up water.
Maximum fill and make-up water quantity
3
V
/ ft
( m³)
max
V
= three times system volume
max
(
Q MBH
,
V
=
0 0243
----------------------------------------------------- -
max
(
)
Ca HCO
3
(
Q kW
,
V
=
0 0313
---------------------------------------------------------
max
(
Ca HCO
3
11.3

Start up the control panel

Please see the accompanying technical documentation for the 4000
series control panel you are using for information on how to start it up.
11.4

Initial burner start-up

▶ When commissioning the burner, follow the installation and
maintenance instructions enclosed with the burner.
▶ Fill out the commissioning log in the burner documentation.
If you notice when taking measurements for the commissioning log that
the flue gas temperature is too low for the flue pipe (risk of
condensation), you can raise the flue gas temperature
( Chapter 11.5, page 36).
System start-up
Boiler water
pH value
8.2–9.5
8.2–9.5
)
gr
-------- -
2
gal
)
mol
)
----------- -
2
3
m
11
35