7.8.3
Fitting the burner door
▶ Place a few drops of Silastic adhesive 6 inches – 8 inches (15 –
20 cm) apart in the packing grooves ( Fig. 31, [2]) on the front
section ( Fig. 31).
▶ Insert GP sealant rope into the packing groove on the front section.
The sealant rope joint should be located at the side ( Fig. 31, [2]).
5
4
Fig. 31 Fitting the hinge pins and locking brackets
In the factory, both burner door hinge lobes are fitted on the right-hand
side ( Fig. 32 [1 and 2]). For left-hand closing, dismantle the hinge
lobes from the right-hand side and reassemble them on the left-hand
side of the burner door.
▶ Screw the hinge pins (right-hand) to the boiler front section with 2
machine screws M12 × 55 in each case ( Fig. 31, [1 and 3]). For
left-hand closing, secure accordingly on the left-hand side.
▶ Screw on locking brackets with run-on slopes for the burner door
(right-hand closing) to the front section with 2 machine
screws M12 × 55 ( Fig. 31, [4 and 5]). For left-hand closing,
secure accordingly on the right-hand side.
Make sure the run-on slopes of the locking brackets are
on the inside of the boiler.
▶ Hook the burner door with the hinge lobes into the hinge pins.
Logano G515 – 6 720 647 208 (2014/09)
5
1
2
4
Fig. 32 Hooking in the burner door
7.8.4
Hot gas check plates on front section
The hot gas check plates ( Fig. 33, [1 and 2]) are each screwed with
3
one hexagon socket screw to the front section at the factory.
720 42 23-29.1o
2
Fig. 33 Position of hot gas check plates
Boiler block assembly
1
3
2
720 42 23-30.1o
1
720 42 23-31.1o
7