Buderus Logano G515 Installation And Service Instructions Manual page 33

Low-temperature oil/gas boiler buderus logano g515
Hide thumbs Also See for Logano G515:
Table of Contents

Advertisement

Fig. 63 Making the electrical connections
▶ Connect the electrical cables as shown in the wiring diagram. Take
care to ensure proper cable and capillary tube routing.
Secure all cables with cable strain reliefs.
▶ Insert cable strain relief with cable inside into the frame and secure
by closing the lever ( Fig. 64, [1]).
1
Fig. 64 Fastening the connecting cables
▶ Engage the lower hook of the rear panel (Logamatic 43xx) with the
frame at an angle and tilt upward until the upper hooks engage with
the side panels ( Fig. 61, [2]).
▶ Put the top cover in place ( Fig. 60, [1]) and tighten the screws
( Fig. 65).
Logano G515 – 6 720 647 208 (2014/09)
1
2
Fig. 65 Boiler with fitted control panel
720 42 23- 0.1o
720 42 23- 1.1o
Installing the control panel
720 42 23- 2.1o
9
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents