Mounting; Connecting Cables; Switching On The System - TANDBERG Gatekeeper User Manual

Tandberg gatekeeper user manual
Hide thumbs Also See for Gatekeeper:
Table of Contents

Advertisement

TANDBERG Gatekeeper User Manual
2.2.1 Installation site preparations
Make sure that the Gatekeeper is accessible and that all cables can be easily connected.
For ventilation: Leave a space of at least 10cm (4 inches) behind the Gatekeeper's rear
and 5cm (2 inches) on the sides.
The room in which you install the Gatekeeper should have an ambient temperature between
0 C and 35 C (32 F and 95 F) and between 10% and 90% non-condensing relative
humidity.
Do not place heavy objects directly on top of the Gatekeeper.
Do not place hot objects directly on top, or directly beneath the Gatekeeper.
Use a grounded AC power outlet for the Gatekeeper.

2.3 Mounting

The Gatekeeper comes with brackets for mounting in standard 19" racks.
Before starting the rack mounting, please make sure the TANDBERG Gatekeeper is placed
securely on a hard, flat surface.
1. Disconnect the AC power cable.
2. Make sure that the mounting space is according to the 'Installation site preparations' in
section 2.2.1.
3. Attach the brackets to the chassis on both sides of the unit.
4. Insert the unit into a 19" rack, and secure it with screws.

2.4 Connecting Cables

Power cable Connect the system power cable to an electrical distribution socket.
LAN cable Connect a LAN cable from the LAN 1 connector on the front of the unit to your
network.
Null-modem RS-232 cable Connect the supplied null-modem RS-232 cable between the Bor-
der Controller's Data 1 connector and the COM port on a PC.

2.5 Switching on the System

To start the TANDBERG Gatekeeper, make sure that the following has been done:
The power cable is connected.
The LAN cable is connected.
4

Advertisement

Table of Contents
loading

Table of Contents