Installation Site Preparations; Rack Mounting (Optional) - TANDBERG MCU User Manual

Hide thumbs Also See for MCU:
Table of Contents

Advertisement

Installation site preparations

• Make sure that the MCU is accessible and that all cables can be easily connected.
• For ventilation: Leave a space of at least 10cm (4 inches) behind the MCU's rear panel and 10cm (4 inches) in
front of the front panel.
• The room in which you install the MCU should have an ambient temperature between 0
95
o
F) and between 10% and 90% non-condensing relative humidity.
• Do not place heavy objects directly on top of the MCU.
• Do not place hot objects directly on top, or directly beneath the MCU.
• Use a grounded AC power outlet for the MCU.
• You will need a CSU (Channel Service Unit) between the MCU and the PRI line from your network provider.

Rack Mounting (optional)

The MCU comes with brackets for mounting in standard 19" racks.
B
NOTE
EFORE STARTING THE RACK MOUNTING
1. Disconnect the AC power cable.
2. Make sure that the mounting space is according to the 'Installation site preparations' (see above).
3. Attach the brackets to the MCU on both sides of the unit.
4. Insert the MCU into a 19" rack, and secure with screws in the front (four screws).
TANDBERG MCU
,
TANDBERG MCU
PLEASE MAKE SURE THE
11
o
C and 35
,
IS PLACED SECURELY ON A HARD
Installation
o
C (32
o
F and
.
FLAT SURFACE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents