Porsche 911 GT3 R 2012 Technical Manual page 64

Hide thumbs Also See for 911 GT3 R 2012:
Table of Contents

Advertisement

5.8.5. Gearbox maintenance
The following work should be carried out regularly:
Check gear ratio teeth, dogs and dog-rings
Check the shift collars
Check the gear hub and gear roller bearings for signs of wear
and pitting
Check the oil for signs of metallic debris
The following work should be carried out after a total running time of
approximately 30 hours:
Check the crown wheel and pinion for pitting
Replace the pinion bearing ( 4-point bearing)
Replace the oil filter
Replace the shift cable
Replace differential housing
The gearbox mount shall be replaced at a maximum running time of 50
hrs.
61

Advertisement

Table of Contents
loading

Table of Contents