Pitney Bowes DM300c Service Manual page 182

Hide thumbs Also See for DM300c:
Table of Contents

Advertisement

5 • Removal & Replacement
WOW Section of Feeder/WOW Module (use for DM475)
5.51 WOW
Unit Chassis
(as a whole
unit)
5-56
5. Remove three screws that attach the rear of the load cell assembly to
the tub. These are the long, washer head screws in the oval adjustment
holes.
6. Remove one screw for brass grounding fingers on right side of bottom
chassis.
7. Remove three screws that attach the front of the load cell assembly to
the tub. These are the long, washer head screws in the oval adjustment
holes accessed through the holes in the front deck that are not keyed.
NOTE: The deck can be loosened if there is difficulty locating the
screws into the hole.
(this long screw is just to the right of visible screw in photo)
Brass Fingers
Screw for
Brass Fingers
DM300c/DM400c/DM475 Service Manual (SV61801 Rev. D)
Three Long Screws
in Rear of Load Cell
Assembly (Circled)
Three Long Screws
in Front of Load Cell
Assembly (Circled)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dm400cDm475Dm450c

Table of Contents