Inspection - Suzuki VL125 Service Manual

Table of Contents

Advertisement

6-8 ELECTRICAL SYSTEM

INSPECTION

BATTERY CURRENT LEAK INSPECTION
• Remove the right frame cover. (!5-3)
• Turn the ignition switch to the OFF position.
• Disconnect the battery - lead wire.
• Connect the multi circuit tester between the - terminal and
- lead wire of the battery.
" 09900-25008: Multi circuit tester set
# Battery current leak: Under 3 mA
$ Tester knob indication: Current (%
&
* Because the current leak might be large, turn the tester
to high range first to avoid tester damage.
* Do not turn the ignition switch to the ON position
when measuring current.
When leakage is found, look for the part where the tester reads
under 3 mA through the couplers and connectors by removing
them one by one.
CHARGING OUTPUT INSPECTION
• Remove the right frame cover. (!5-3)
• Start the engine and keep it running at 5 000 r/min. with light-
ing switch turned ON and dimmer switch turned HI position.
Measure the DC voltage between the battery terminals + and
- with the multi circuit tester. If the tester reads under 13.4 V or
over 15.1 V, inspect the generator coil and regulator/rectifier.
NOTE:
When making this test, be sure that the battery is in fully-charged
condition.
" 09900-25008: Multi circuit tester set
09900-25006: Engine tacho tester
# Charging output (Regulated voltage):
' Tester knob indication: Voltage (%
% , 20mA)
%
%
%
13.5 – 15.0 V at 5 000 r/min.
% )
%
%
%
DCmA
Battery
-
+
Battery
-
+
DCV

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents