Defaulting The Panel - GE NX-10 Installer Manual

Hide thumbs Also See for NX-10:
Table of Contents

Advertisement

electrician or other suitably trained and qualified person should attempt to wire this system to the
mains or to the public telephone network.
Ensure that there is a good earth for the alarm system for effective resistance to electrical
1.
interference. Provide an earth connection for the standalone telephone dialer.
For mains power connection, use the mains connector terminal either via permanent
2.
wiring or a doubly insulated flexible mains cable to an earthed mains outlet. Always use
cable ties to fix the mains cable, at the dedicated fixing point provided near the mains
terminal connector.
CAUTION: Never attempt to solder a mains connection wire's end where they will be wired to the terminal
connectors.
The battery used with the NX-10 must be made of materials of flammability class HB or
3.
better.
The mains switching relay must not be fitted inside the control panel cabinet.
4.
The minimum clearance between equipment closures is 50 mm between equipment vents.
Only use units in a clean environment and not in humid air.

Defaulting the panel

Before installing and programming the system, default the panel to ensure that you have the correct
country defaults according to your local regulations, see Country codes section. Also see the Reset
Settings command description in the control panel section glossary.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents