Omron POWLI BU60RE Instruction Manual page 22

Uninterruptible power supply
Table of Contents

Advertisement

2
.Installation and connection
(2) Adjust the length of support angles to suit the server rack, and then securely tighten the
screws that were half-tightened in step 1.
(3) For EIA standard-compliant installation, use the 8 included EIA rack fi xing nuts (M5) and 8
EIA/JIS rack fi xing screws (M5) to securely fasten the front (the side displaying "L" or "R")
and the back of the support angles to the server rack.
For JIS standards, use a total of 6 included screws to fi x the rack; 1 JIS rack fi xing fl at-head
screw (M5) at a front position of the each of right and left support angles, 2 EIA/JIS rack fi x-
ing screws (M5) at 2 rear positions.
screw hole from the top, the rear is at the second screw hole from the bottom.
(4) Use the 8 included ear bracket mounting fl at-head screws (2 sets of 4 screws) to securely
fasten the ear brackets to the left and right sides of the UPS.
The support angles cannot be attached to special EIA/JIS racks.
10
3
Adjust the length to
suit the server rack
and tighten securely.
2
4
The screw hole position for the front is at the second
2
3
Rack fixing screws
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powli bu100re

Table of Contents