Insert Placement; Zero Clearance (Metal) Fireplace Requirements; Hearth Requirements - Travis Industries DVL EF Insert Owner's Manual

Table of Contents

Advertisement

Installation
8

Insert Placement

Insert must be placed within a code-conforming masonry fireplace or tested and listed zero-clearance
(metal) fireplace. Fix any fireplace damage prior to installation.
Because the insert uses a circulation blower, clean the fireplace, smoke shelf, and chimney prior to
installation. We recommend painting the interior surface of the fireplace with latex paint to further
eliminate dust.
This heater may be placed in a bedroom. Please be aware of the large amount of heat this appliance
produces when determining a location.
Min. 23-3/4"
The gas line and shutoff
valve should be installed
prior to insert placement.
Travis Industries
For tight fits (under 28"), you may remove the manifold. See the
section "Removing the Manifold"
Min. 38-1/4" - Includes 6" for gas line installation
Run the on/off switch wires to the
right, behind the surround panels.
(for qualified installers only)
The DVL inserts 16" into the
fireplace.
Run the power cord to either
side of the insert along the face.
4 0 4 1 0 2 8
Use the leveling bolts for
fireplaces with recessed floors.
1 0 0 - 0 1 1 5 1

Advertisement

Table of Contents
loading

Table of Contents