Multi-connected configuration using ATM PNC

In this example, the multi-connect configuration has seven Port Networks and three ESS
servers. As in the previous IP connected configuration example, the administrator wants to
design the system so the system stays as much in-tact as possible after a failover. Should IPSI
communication to the Main server(s) fail, the administrator wants ESS server 1 to provide
service to the entire system. If the IPSIs loses communication with ESS server 1, then ESS
server 2 will take over the entire system. Port Networks 6 and 7 connect to the Main server(s)
over the ATM network and do not have a direct IPSI connectivity to the Main server(s).
See
Figure 29
scoring of each ESS server:
80 Avaya Enterprise Survivable Servers (ESS) Users Guide
for the customer's multi-connected ATM PNC configuration with the priority

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents