Powerware
When planning the installation, consider the UPS weight for floor
loading. The strength of the installation surface must be adequate for
point and distributed loadings. The approximate weights are shown in
the following table.
Standard Model Floor Loadings (2-High/3-High Cabinets)
Powerware 9155
2-High UPS
3-High UPS
3-High UPS with
Isolation
Transformer
2-High EBM
3-High EBM
The following clearances are recommended for the Powerware 9155 UPS:
From Front of Cabinet
From Back of Cabinet
9155 UPS (8–15 kVA) User's Guide
®
Maximum
Point Loading
Weight (lb)
(lb/in
352
590
558
480
710
36" (91.4 cm) working space
6" (15.2 cm) without MBM/PDM installed; with
MBM/PDM installed, clearance determined by
customer-supplied mating plug
164201553 Rev D www.powerware.com
S
Distributed
2
)
Loading (lb/ft
88
166
148
278
140
263
120
226
178
335
2
)