UPS SETUP

Floor Loading

When planning the installation, consider the UPS weight for floor
loading. The strength of the installation surface must be adequate for
point and distributed loadings. The approximate weights are shown in
the following table.

Clearances

The following clearances are recommended for the Powerware 9155
UPS:
From Front of Cabinet
From Back of Cabinet
8
EATON Powerware
Standard Model Floor Loadings (2-High/3-High Cabinets)
Maximum
Powerware 9155
Weight (lb)
2-High UPS
352
3-High UPS
590
3-High UPS with
558
Isolation
Transformer
2-High EBM
480
3-High EBM
710
36" (91.4 cm) working space
6" (15.2 cm)
®
9155 Parallel UPS (8–15 kVA) User's Guide
Point Loading
Distributed
2
(lb/in
)
Loading (lb/ft
88
148
140
120
178
S
164201592 Rev C www.powerware.com
2
)
166
278
263
226
335