Maintenance; Routine Maintenance; Major Components - Teledyne 2010A Operating Instructions Manual

Thermal conductivity analyzer
Table of Contents

Advertisement

Thermal Conductivity Analyzer
4.1
Aside from normal cleaning and checking for leaks at the gas connec-
tions, routine maintenance is limited to recalibration.
Self-diagnostic testing of the system and fuse replacement in the Con-
trol Unit are covered in Part I, chapter 5 of this manual. For recalibration, see
Part I, section 4.4 Calibration.
WARNING: SEE WARNINGS ON THE TITLE PAGE OF THIS
4.2
The internal components are accessed by rotating the explosion-proof
housing cover counterclockwise several turns until free. See Figure 4-1,
below.
WARNING: SEE WARNINGS ON THE TITLE PAGE OF THIS
The 2010A Analysis Unit contains the following major components:
TC Cell
Optional Auto-Cal Solenoid Assy.
Heater Assembly
Electrical Connector Panel
Gas Connector Panel (external)
See the drawings in the Drawings section in back of this manual
for details.

Maintenance

Routine Maintenance

MANUAL.

Major Components

MANUAL.
Teledyne Analytical Instruments
Part II: Analysis Unit
Part II: 4-1

Advertisement

Table of Contents
loading

Table of Contents