This procedure describes upgrading an ECM Member server from Rls
5.00 to Rls 5.50. Perform this procedure for each ECM Member server
in the system.Prior to upgrading the Backup ECM Security server, the
Primary ECM Security server must be upgraded using one of the Upgrade
a Primary ECM Security server procedures.
Upgrade ECM Member server
Step
If there is a Backup ECM Security server, it must be upgrading prior to completing
this procedure. Complete the previous procedure.
1
2
3
4
5
6
7
8
Linux Platform Base and Applications Installation and Commissioning
Copyright © 2007–2008 Nortel Networks
.
Action
Open a command line interface session to the Primary ECM
Security Server through the serial port with the nortel account.
Perform a backup of the ECM Member server data using the
command
sysbackup –b
Perform a fresh install of the Nortel Linux base software using
the procedures in
"Install Nortel Linux base " (page
Install the CS1000 application software using the procedures
described in
"Install the CS 1000 applications" (page
Install the following patches onto the Primary ECM Security
server using the
"Patching Operation" (page 106)
MPLR25520
MPLR25521
Open a command line interface session to the Primary ECM
Security Server through the serial port with the nortel account.
Perform a restore of the ECM data using the command
sysrestore
Switch user to the root account and execute the script
/opt/nortel/linuxTrustMgmt/setupNonCA.sh
This script prompts for certificate parameters to create a new
certificate for the Backup ECM Security server.
Nortel Communication Server 1000
NN43001-315 02.09
29 October 2008
ECM Upgrade Procedures 33
procedure:
--End--
35).
70).

Advertisement

Table of Contents
loading

Table of Contents