2.
Insert the power supply into the slot and push the handle up. Verify that the power supply is
seated by gently pulling on the handle (see
3.
Tighten the thumb screw.
4.
Replace the power cord.
5.
Turn on the power switch.
6.
Verify that the power LED on the power supply displays a steady green light.
Figure 70 Power supply
Replacing a blower assembly
IMPORTANT:
The DC04 SAN Director can continue operating during the replacement if the second blower assembly
is operating.
The procedure for removing each blower assembly takes less than 5 minutes. The following items are
required for the blower assembly replacement:
•
Replacement blower assembly
•
Phillips #2 screwdriver
HP StorageWorks DC and DC04 SAN Backbone Director Switches
Figure
70).
185