Installing A Hot-Swappable Power Supply - HP Integrity rx2800 - i2 User's & Service Manual

Rx2800 i2 user service guide
Hide thumbs Also See for Integrity rx2800 - i2:
Table of Contents

Advertisement

IMPORTANT:
Save the hard drive filler for future use. For airflow purposes, place hard drive fillers in slots that
do not contain hard drives.
1.
Remove the hard drive filler, by squeezing the tab and pulling out the filler.
2.
Install the hard drive, by pushing in the drive and closing the locking lever.

Installing a hot-swappable power supply

The server has at least one hot-swappable power supply installed before shipping. This power
supply is located at the rear of the server. You can install a second, optional power supply to
provide 1+1 capability.
Figure 12 Power supply loading guidelines
SAS hard drives are loaded in sequence, starting with slot 1.
Installing additional components
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents