Power on a second unit, making sure it is adjacent (next physical unit in the stack) to the unit already
powered up. This will insure the second unit comes up as a member of the stack, and not a "Master" of
a separate stack.
7.
Monitor the master unit to see that the second unit joins the stack. Use the "show switch" command to
determine when the unit joins the stack. It will be assigned a unit number (unit #2, if it has the default
configuration).
8.
Renumber this stack unit, if desired. See section
renumbering stack members.
9.
Repeat steps 6 through 8 to add additional members to the stack. Always power on a unit adjacent to the
units already in the stack.

Removing a Unit from the Stack

1.
Make sure the redundant stack connection is in place and functional. All stack members should be
connected in a logical ring.
2.
Power down the unit to be removed.
3.
Disconnect stack cables.
4.
If unit is not to be replaced, reconnect the stack cable from the stack member above to the stack member
below the unit being removed.
5.
Remove unit from the rack.
6.
If desired, remove the unit from the configuration by issuing the command:
no member <unit-id>

Adding a Unit to an Operating Stack

1.
Make sure the redundant stack connection is in place and functional. All stack members should be
connected in a logical ring.
2.
Preconfigure the new unit, if desired.
3.
Install new unit in the rack. (Assumes installation below the bottom-most unit, or above the top-most
unit).
4.
Disconnect the redundant stack cable that connects the last unit in the stack back up to the first unit in
the stack at the position in the ring where the new unit is to be inserted.
5.
Connect this cable to the new unit, following the established order of "stack up" to "stack down"
connections
6.
Power up the new unit. Verify, by monitoring the master unit console port, that the new unit successfully
joins the stack by issuing the show switch command. The new unit should always join as a "member"
(never as master; the existing master of the stack should not change).
7.
If the code version of the newly added member is not the same as the existing stack, update the code as
described in section
20-10
"Upgrading
Firmware".
v1.0, November 2008
"Renumber Stack Members"
on recommendations for
Managing Switch Stacks

Advertisement

Table of Contents
loading

Table of Contents