Verifying The Installation - H3C S5800-32F Installation Manual

S5800 series ethernet switches
Hide thumbs Also See for H3C S5800-32F:
Table of Contents

Advertisement

Step2 Loosen the captive screws on the PoE module counterclockwise with the Philips screwdriver until all
spring pressure is released.
Step3 Hold each ejector lever with a hand and pull the ejector levers outward (see callout 1 in
Then pull out the PoE module slowly along the guide rails (see callout 2 in
Figure 3-46 Remove a PoE module
When installing or removing the PoE module, note the following:
Do not use excessive force while installing or removing the PoE module.
If you do not install a new PoE module in the slot, install a filler panel to prevent dust from entering
the switch and ensure the normal ventilation in the switch.

Verifying the Installation

Before powering on the switch, check that:
There is enough space for heat dissipation around the switch, and the rack or workbench is stable.
The ground wire is connected.
The selected power module matches that required by the switch.
The power cables are properly connected.
All the interface cables are cabled indoors. If there is any cable wired outdoors, verify that socket
strip with lightning protection and lightning arresters for network ports have been properly
connected.
3-29
Figure
3-46).
Figure
3-46).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents