Verifying The Installation; Accessing The Switch For The First Time - H3C S1850V2-EI Series Installation Manual

Hide thumbs Also See for S1850V2-EI Series:
Table of Contents

Advertisement

Figure2-15 Connecting the AC power cord for the fixed AC power supply
Figure2-16 Securing the AC power cord for the fixed AC power supply through a cable tie

Verifying the installation

After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack or workbench is
stable.
The grounding cable is securely connected.
The correct power source is used.
The power cords are correctly connected.
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with lightning protection and lightning arresters for network ports have been correctly
connected.
3

Accessing the switch for the first time

When the switch is powered on and started up for the first time, you can access the Web GUI of the
switch to manage it.
3-16

Advertisement

Table of Contents
loading

Table of Contents