3.
Connect the other end of the power cord to a –48 VDC power source or an RPS.
Figure2-30 Connecting the DC power cord for a PSR150-D1 power supply (S5130S-52F-EI)

Verifying the installation

After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack or workbench is
stable.
The grounding cable is securely connected.
The correct power source is used.
The power cords are correctly connected.
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with lightning protection and lightning arresters for network ports have been correctly
connected.