Installing An Oap Card; Installing An Oap Card To The Switch - H3C S5800-32F Installation Manual

S5800 series ethernet switches
Hide thumbs Also See for H3C S5800-32F:
Table of Contents

Advertisement

Installing an OAP Card

Installing an OAP Card to the Switch

Step1 Wear an ESD-preventive wrist strap, ensure a good skin contact and make sure that the
ESD-preventive wrist strap is properly grounded.
Step2 Loosen the captive screws on the filler panel with a Phillips screwdriver, as shown in
remove the filler panel from the slot to be used. Keep the removed filler panel properly for future use.
Figure 3-42 Remove the filler panel
(1) Rotation direction of the
Phillips screwdriver
Step3 Take the OAP card out of the package.
Step4 Push the OAP card slowly along the guide rails (see (3) in
inward to lock the OAP card in position (see (4) in
Figure 3-43 Install the OAP card to the switch
(1) OAP card
(2) Filler panel of the OAP card slot
(2) Rear panel of the
switch
3-26
Figure
3-43) and then push the ejector levers
Figure
3-43).
(3) Insertion direction of
the OAP card
Figure
3-42, and
(3) Phillips screwdriver
(4) Inward direction

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents