Installing the ValueLoader

Preparing the Host and Verifying the Connection

Preparing the Host and Verifying the Connection

14
ValueLoader DLT VS80/DLT VS160 Tape Autoloader User Manual
Plug the power cable into the nearest properly grounded
6
power outlet.
To disconnect all power from the ValueLoader,
Note:
remove the power cord from the outlet.
Plug in the host server or workstation and all attached devices.
7
Turn on the ValueLoader by setting the power switch on the
8
front panel to the ON position. Turn on any other devices you
turned off earlier. Check the LCD display to make sure the
ValueLoader is receiving power. If it is not, check the power
connectors and your power source.
During the Power-On Self Test (POST), all four LEDs are
illuminated briefly, followed by just the Ready/Activity LED
flashing. When the initialization sequence is complete, the LCD
screen displays the Home screen.
Turn on the server.
9
If necessary, install a SCSI host adapter, software, and compatible
driver(s). Refer to the manuals for the host computer and the SCSI
host adapter for detailed instructions. In addition, follow these
general guidelines:
• When the host server is powered on, install software, and/or
driver(s) that are compatible with the ValueLoader. (See
Installing the Device Drivers
Software compatibility information is available at our Web site.
Most backup software packages require an additional module
to communicate with the ValueLoader robotics.
• If the host server is connected to a network, check with the
system administrator before turning off power.
on page 16 for more information.)