Preparing The Host And Verifying The Connection - Freecom VALUELOADER LTO User Manual

Lto tape autoloader
Table of Contents

Advertisement

Preparing the Host and Verifying the Connection

Plug the power cable into a properly grounded power outlet.
6
To disconnect all power from the ValueLoader,
Note:
remove the power cord from the outlet.
Plug in the host server or workstation and all attached devices.
7
Turn on the ValueLoader by setting the power switch on the
8
front panel to the ON position. Turn on any other devices you
turned off earlier. Check the LCD display to make sure the
ValueLoader is receiving power. If it is not, check the power
connectors and the power source.
During the power-on self test (POST), all four LEDs are
illuminated briefly, followed by just the Ready/Activity LED
flashing. When the initialization sequence is complete, the LCD
screen displays the Home screen.
Turn on the server.
9
If necessary, install a SCSI host adapter, software, and compatible
driver(s). Refer to the manuals for the host computer and the SCSI
host adapter for detailed instructions. In addition, follow these
general guidelines:
• When the host server is powered on, install software, and/or
driver(s) that are compatible with the ValueLoader. (See
Installing Device Drivers
Most backup software packages require an additional module
to communicate with the ValueLoader robotics.
• If the host server is connected to a network, check with the
system administrator before turning off power.
• Use proper procedures to prevent electrostatic discharge
(ESD). Use wrist-grounding straps and anti-static mats when
handling internal components.
ValueLoader LTO Tape Autoloader User Manual
Installing the ValueLoader

Preparing the Host and Verifying the Connection

on page 17 for more information.)
1
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Valueloader

Table of Contents