Control Period Read: Rt - Omron E5ZE-8 Communications Manual

Multipoint temperature controller
Table of Contents

Advertisement

Control Period Read: RT

3-12 Control Period Read: RT

Function
Command
@
x16
Response
@
Unit
1
x16
x16
Communications Example
Command
Response
100
This command is used to read the control period that have been set at a con-
trol point.
The cooling - side control period that have been set at a control point can be
read provided that the E5ZE is a heating and cooling control model.
Unit
R
T
1
0
x16
Header code
R
T
End code
1
0
x16
Header code
1. The response block for Control Period Read (RT) does not include read
data if the end code of the response block is other than 00.
2. Refer to 2-4 End Codes .
In this example, the E5ZE is operated with Control Period Read (RT) under
the following conditions.
Unit no.:
Memory Bank no.: 2
Control Point:
Control Period:
@
0
@
0
Control
Bank
Data code
point
00: Control period
01: Cooling-side control period for
Read data
Control period
0
3
2
x16
x10
x10
1
3
5 s
1
R
T
2
3
1
R
T
0
0
Normal end
*
FCS
Terminator
heating and cooling models only.
FCS
1
x10
x10
0
*
0
0
4
6
Control period
0
0
0
5
5 s
Section 3-12
s
*
s
Terminator
s
*
s
4
2

Advertisement

Table of Contents
loading

Table of Contents