Eu Declaration Of Conformity; Safety Information; Installation; Unpacking - YOKOGAWA YPP6830-AP0-0 Instruction Manual

Explosion-proof pulse input rate/totalizer
Table of Contents

Advertisement

YPP6830 Explosion-Proof Pulse Input Rate/Totalizer
EU Declaration of
Conformity
For shipments to the EU and UK, a Declaration of
Conformity was printed and included with the product.
For reference, a Declaration of Conformity is also
available on our website.

Safety Information

Read complete instructions prior to installation and
operation of the meter.
Installation and service should be performed only
by trained service personnel. Service requiring
replacement of internal components (not including
battery, if equipped) must be performed at the
factory.
Disconnect from supply before opening enclosure.
Keep cover tight while circuits are alive. Conduit
seals must be installed within 18" (450mm) of the
enclosure.
Verify that the operating atmosphere of the meter
is consistent with the appropriate hazardous
locations certifications.
If the meter is installed in a high voltage
environment and a fault or installation error occurs,
high voltage may be present on any lead.

Installation

For Installation in USA: The YPP6830 must be
installed in accordance with the National Electrical
Code (NEC) NFPA 70.
For Installation in Canada: The YPP6830 must be
installed in accordance with the Canadian Electrical
Code CSA 22.1.
For European Community: The YPP6830 must be
installed in accordance with the ATEX directive
2014/34/EU, the product certificate Sira
13ATEX1121X, and the product manual.
Installation and service should be performed only
by trained service personnel. Service requiring
replacement of internal components must be
performed at the factory.
Disconnect from supply before opening
enclosure. Keep cover tight while circuits are
alive. Conduit seals must be installed within
18" (450mm) of the enclosure.
Wiring connectors are accessed by opening the
enclosure. To access electrical connectors, remove
the two captive screws, then disconnect the ribbon
cable from the display module and set the display
module aside.

Unpacking

Remove the meter from box. Inspect the packaging
and contents for damage. Report damages, if any, to
the carrier.
If any part is missing or the meter malfunctions,
please contact your supplier or the factory for
assistance.
11
Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents