Post-Maintenance Bleeding - Kohler KD62V12A Operation And Maintenance Manual

Table of Contents

Advertisement

Maintenance
Post maintenance activities
WARNING
Risk of injuries by explosion of pressurized container.
Explosion of pressurized container could result in death or serious injuries.
u Do not pierce or burn the pressurized container, even after use.
u Protect the pressurized container from sunlight.
u Make sure the pressurized contained is not exposed to temperatures over 50 °C (122 °F).
Scope
Spray painting may be necessary in the following cases:
– Touch-ups following damage to the original paint
– Painting of spare parts delivered unpainted
Previous tasks
Make sure that the following preconditions are met:
q The surface to be painted is clean and free of grease, dust, and debris.
q The spray paint can is at ambient temperature.
q All areas not to be painted are masked.
Consumables and equipment
Make sure that the following consumables and equipment are available:
– Spray paint can - black color (12692707)
– Rags
– Cleaner
Painting
u Shake the spray paint can for 3 minutes.
u Spray the paint at a distance of 25 cm (9.84 in) to 30 cm (11.81 in), making a criss-cross
pattern.
u Spray enough layers to cover the whole unpainted area.
u Turn the spray can upside down and bleed the valve after finishing the paint work.
Information
In optimal conditions (20 °C (68 °F), 65% of humidity), the paint is completely dry after 24 hours.

5.5.3 Post-maintenance bleeding

Previous tasks
Make sure that the following preconditions are met:
q Maintenance activities are completed.
q Covers and guards are reinstalled.
q Lockout/tagout procedure is completed.
Specific safety advice
Not applicable.
102
(→ Lockout/tagout, p. 44)
© 2023 by Kohler Co. All rights reserved.
KD62V12A 33521061401_1_1 EN_US
2023-10

Advertisement

Table of Contents
loading

Table of Contents