Post Maintenance Activities; Part Reinstallation; Spray Painting - Kohler KD62V12A Operation And Maintenance Manual

Table of Contents

Advertisement

5.5 Post maintenance activities

5.5.1 Part reinstallation

Previous tasks
Make sure that the following preconditions are met:
q Maintenance activities are completed.
Specific safety instructions
Not applicable.
Consumables and equipment
Not applicable.
Inspection
u Make sure that all removed components or parts are reinstalled.
u Make sure that torques were applied according to tightening specifications.
Standard tightening torques, p. 220)
u Make sure that all tools, special tools, rags, and other consumables are removed from the
engine.

5.5.2 Spray painting

Specific safety instructions
DANGER
Fire or explosion by flammable and explosive chemical products.
Burns or explosion release will result in death or serious injury.
u Avoid any contact of flammable and explosive chemical products with any hot surface or
ignition source.
u Lock out and tag out the engine prior to carrying out paint works on it.
u Ensure a good ventilation while carrying out paint works on the engine.
u Smoking and open flames are forbidden in the vicinity of the engine.
WARNING
Risk of injuries by contact with or inhalation of chemical products.
Contact with or inhalation of chemical products could result in death or serious injuries by
intoxication or poisoning.
u Wear proper personal protective equipment.
u Refer to the local regulations and the product associated data to safely handle, store, and
use these products.
KD62V12A 33521061401_1_1 EN_US
2023-10
© 2023 by Kohler Co. All rights reserved.
Maintenance
Post maintenance activities
(→ 8.4
101

Advertisement

Table of Contents
loading

Table of Contents