Final Inspections; General - DeLonghi NESCAFE Dolce Gusto EDG 305 Service Manual

Table of Contents

Advertisement

F I N A L   I N S P E C T I O N S 
General 
Legal situation 
Repair centres can be legally obligated to ensure the safety and physical integrity of the 
user/consumer by national regulations and standards. 
The basic demands of these regulations are: 
The regular condition of the coffee machine has to be restored after a repair. 
If the housing bottom of the coffee machine was removed during a repair, certain 
tests like shown in this chapter have to be performed after final assembly. 
Test equipment 
The necessary test equipment 
­
has to be obtained by the repair centre, 
­
must comply with EN/IEC 60335­1 and national standard(s) for after­repair testing 
(e.g. DIN VDE 0701), 
­
has to be calibrated by a qualified test centre periodically. 
Ideally the test equipment has a national power socket for testing, so that the coffee 
machine can plugged in directly. Otherwise a special shunt is necessary to connect the 
phase and neutral pin of the coffee machine's power plug. 
Only symbolic illustrations of test equipment are shown in this manual.
Test procedures 
The after­repair tests shown in this chapter 
­
are based on the German standard DIN VDE 0701 ­ 0702, 
­
are valid therefore for German repair centres only, 
­
are explained only generally and serve as an example for other nationalities. 
For detailed information refer to the operating manual of your test equipment and your 
national standard(s) for after­repair test. 
Job­related requirements for after­repair testing 
After­repair tests should only be performed by a certitfied electrician 
­
with experience in electrical metrology, 
­
who is familiar with the test equipment and the applicable national standard(s). 
Test report 
The repair centre should prepare a test report for each repaired coffee machine and 
keep it safely.
F I N A L   I N S P E C T I O N S 
Service manual 
53 

Advertisement

Table of Contents
loading

Table of Contents