44
R E P A I R
5. Cut cable ties and remove extraction head's pressure hoses from thermoblock (9)
and pump (21).
6. Pull out complete extraction head.
Assembly tips
•
After fastening the new extraction head on main housing, attach locking lever with
control unit.
•
Lead cables of locking handle through opening (w) and cables of extraction head
through opening (v) in main housing before connecting them to electronic mainboard
•
Fix cables on extraction head with two cable ties on the motor assembly.
Service manual