INSTALLATION SEQUENCE

The typical sequence of installation is outlined below; however, each installation is unique and may result in
variations to the steps described.
See the pages referenced in the following steps for detailed instructions.
Check local codes for more restrictive installation. The more restrictive installation for clearances must be used.
Framing
1. Construct the Fireplace Framing (Page 17).
2. Prepare the Fireplace Top Spacers (Page 19).
3. Route the Gas Supply Line to the Fireplace (Page 19).
4. Determine Vent Setup in the Combination Venting Unit (Page 20).
5. Install Non-Combustible Front Fireboard Standoff and Header Shield (Page 20)
6. Rough in the Electrical Supply, if necessary (Page 21).
7. Place the Fireplace in the Framing and Secure (Page 21).
Venting
8. Vent System Preparation - Select a Horizontal or Vertical Vent System (Page 21).
9. Install the Vent Restrictor, if necessary (Page 22).
10. Connecting the Vent Pipe (Page 23).
11. Install the Vent System (Page 25).
Electrical Connection
12. Complete the Field Wiring (Page 37).
Gas Connection
13. Connect the Gas Line (Page 39).
14. Verify Proper Fireplace Operation (Page 40).
Finishing
15. Install the Firebox Liners (Pages 41-42).
16. Install Accessory Logs, Rock Kits and the Glass Media. (Page 43).
17. Install the Glass Door (Page 47).
18. Adjust the Air Shutter to Ensure Proper Flame Appearance (Page 50).
19. Install the Hood (Page 51).
20. Installation/Reinstallation of the Required Barrier (Page 51).
21. Blower Installation/Replacement (Page 52).
22. Install the Finishing Materials (Page 53).
23. Attach the Safety-in-Operation Warning Labels (Page 53).
24. Installation Accessories (Page 55).
25. Gas Conversion Kits (Page 57).

Construct the Fireplace Framing

1.
1. Frame the fireplace as illustrated in Table 10. For corner framing installations, use Table 11. All framing details
must allow for a minimum clearance to combustible framing members as shown in Table 8.
2. If the fireplace is to be elevated above floor level, a solid continuous platform must be constructed below the fireplace.
NOTE: Headers may be in direct contact with the fireplace top standoff spacers when they are bent up vertically,
and header shield installed, maintaining the 4" clearance to the fireplace top, but must not be supported by
them or notched to fit around them. All construction above the fireplace must be self-supporting. DO NOT use the
fireplace for structural support.