VENT TERMINATION CLEARANCES

These instructions should be used as a guideline and do not supersede local codes in any way. Install venting with the
most restrictive requirements as outlined in these instructions, local codes, these instructions, the current National
Fuel Gas Code (ANSI Z223.1/NFPA 54) in the USA or the current standards of CAN/CGA-B149.1 in Canada.
Vertical Vent Termination Clearances
Terminate multiple vent terminations according to the installation codes listed above and Figure 3.
Figure 3 - Multiple Terminations
Terminate single vent caps relative to building components according to Table 6.
Table 6 - Termination Heights for Vents above Flat or Sloped Roofs (NFPA 54 / ANSI Z223.1)—Gas Vent Rule
Horizontal Vent Termination Clearances
The horizontal vent termination must have a minimum of 6" (152 mm) clearance to any overhead combustible
projection of 2-1/2" (64 mm) or less (Figure 4). For projections exceeding 2-1/2" (64 mm) (Figure 4). For additional
vent location restrictions refer to Table 7.
All horizontal terminations may be located as close as 6" (152mm) to any (non-combustible and combustible)
exterior sidewall. This distance may be decreased to 2" (51mm) for noncombustible exterior sidewalls with all
approved terminations (Table 7).
Figure 4 - Horizontal Vent Termination Clearances
12"
(305 mm)
minimum
TERMINATION HEIGHTS FOR VENTS ABOVE
FLAT OR SLOPED ROOFS
Horizontal overhang
2 ft
2 ft minimum
minimum
Lowest
discharge
Vent
opening
Termination
H*
Storm collar
12
Flashing
Roof pitch is X/12
1" (26mm) minimum
clearance to combustibles
Concentric
*H = minimum height from roof to
Vent Pipe
lowest discharge opening of vent
Combustible projection
greater than 2-1/2" in length
Ventilated
Unventilated
soffit - 18"
soffit - 12"
(457 mm)
(305 mm)
Termination kit
6"
(153 mm)
Vertical
Wall
X
Combustible projection
2-1/2" or less in length
6" (152mm)
901191-00C, 07/2023
Roof Pitch
Termination Height *
Flat to 6/12
6/12 to 7/12
1.25 ft (0.38 m)
7/12 to 8/12
1.5 ft (0.46 m)
8/12 to 9/12
2.0 ft (0.61 m)
9/12 to 10/12
2.5 ft (0.76 m)
10/12 to 11/12
3.25 ft (0.99 m)
11/12 to 12/12
4.0 ft (1.22 m)
12/12 to 14/12
5.0 ft (1.52 m)
14/12 to 16/12
6.0 ft (1.83 m)
16/12 to 18/12
7.0 ft (2.13 m)
18/12 to 20/12
7.5 ft (2.29 m)
20/12 to 21/12
8.0 ft (2.44 m)
6"
Termination kit
General Information
1.0 ft (0.3 m)
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Drc3035den-bDrc3040den-bDrc3045den-b

Table of Contents