Items Requiring Confirmation Before Installation - Fujitsu ORACLE M10-1 Installation Manual

Hide thumbs Also See for ORACLE M10-1:
Table of Contents

Advertisement

Figure 2-1     Rack configuration (for the PCI expansion unit)
2.2
Items requiring confirmation before
installation
This section describes the items that you need to confirm before installing the SPARC
M10 system. Before starting installation work, confirm that the requirements in
2-1
have been met.
Table 2-1     List of items requiring confirmation before installation
Check item
System
configuration
Training
Fujitsu M10-1/SPARC M10-1 Installation Guide ・ March 2019
12
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
PCI-BOX (2U)
- Has the system configuration been determined?
- Has the required rack space been confirmed?
- Has the number of racks been decided?
- Have the system administrator and operators attended the
required training courses?
Table
Check
column

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m10-1

Table of Contents