Figure 4-5 Locking a cable clamp
6.
Secure cables to the CMA.
a. Pull out the chassis until the CMA is fully extended.
b. Bundle cables such as the power cords, LAN cables, and FC cables, and
c. Put the chassis back into the rack.
Note - Ensure that the FC cable, when secured, has a bend radius of 30 mm (1.2 in.) or more.
7.
Check the movement of the CMA.
a. Pull out the chassis slowly to check whether it moves smoothly.
b. Confirm that the laid cables are not twisted.
4.2
Connecting Cables to the PCI
Expansion Unit
This section describes the procedure for connecting the management cable, link
cables, and power cords to the PCI expansion unit.
Fujitsu M10-1/SPARC M10-1 Installation Guide ・ March 2019
74
A
secure them with the cable clamp on the CMA.