To Rotate The Switch Box; To Close The Outdoor Unit - Daikin EWYA004D2V3P Installer's Reference Manual

Packaged air-cooled water chillers and packaged air to water heat pumps
Hide thumbs Also See for EWYA004D2V3P:
Table of Contents

Advertisement

7.3.3 To rotate the switch box

7.3.4 To close the outdoor unit

EWAA004~008D + EWYA004~008D
Packaged air-cooled water chillers
and packaged air to water heat pumps
4P688013-1B – 2022.09
During the installation, you will need access to the inside of the outdoor unit. To
have easier front access, rotate the switch box out of the unit as follows:
Prerequisite: The front plate has been removed.
1 Push down the clip of the switch box holder.
1
2 Rotate the switch box out of the unit.
2
3 Rotate the switch box back until it engages properly in the switch box holder.
NOTICE
Speed nut. Make sure the speed nut for the top screw is correctly attached to the
service cover.
3
4
7
Unit installation
|
Installer reference guide
57

Advertisement

Table of Contents
loading

Table of Contents