Husky Altanium Delta5 User Manual page 235

Table of Contents

Advertisement

User Guide
7.
Figure 15-35 Touchscreen Signal, Monitor Video, and Monitor Power Cables
8.
Install the Alternative Mounted Operator Interface
Connect the Touchscreen Signal cable connector, Touch Monitor Video cable connector
and Touch Monitor Power cable connector to the Touch Screen connector, LCD 12 VDC
connector, and VGS connector on the bottom of the MCU. Refer to
Use tie wraps to collect the lengths of cables between the touch monitor, controller
mainframe, and MCU. Make sure that all wires are away from pinch points and that there
is enough service loop to let the touch monitor and swing arm move freely. Refer to
Figure
15-36.
v 1.0 — February 2020
Maintenance
Figure
15-35.
223

Advertisement

Table of Contents
loading

Table of Contents