Husky Altanium Delta5 User Manual page 221

Table of Contents

Advertisement

User Guide
Figure 15-15 Removal of the Monitor Screws
13. Securely hold the touch monitor and slide it upwards until the screws have cleared the
Figure 15-16 Lift Monitor from Bracket
14. When you install the replacement monitor, make sure that the screws are pre-installed
15. Securely hold the monitor and slide it down onto the mounting bracket, so the top
16. Install the two bottom socket cap screws.
Remove and Replace the Touch Monitor
upper mounting slots and pull forward to remove the touch monitor from the mounting
bracket. Refer to
Figure
on the upper threaded studs and the screws are left off the lower studs on the back of
the touch monitor.
monitor screws go into the bracket slots.
v 1.0 — February 2020
15-16.
Maintenance
209

Advertisement

Table of Contents
loading

Table of Contents