Connecting The Power Optimization System - Henny Penny FSDE610 Installation Manual

Table of Contents

Advertisement

Connecting the unit

6.2.2 Connecting the power optimization system

DANGER
DANGER
Prerequisite Unit dead
28
5. Close the housing (see "Opening and closing the housing").
6. Fill out the start-up operation report.
Risk of personal injury and property damage from electric shock
• Before working on the unit, ensure that the unit has been disconnected from
the power supply.
Risk of personal injury and property damage from electric shock
• Before connecting, ensure that the electrical connection line is dead.
• Ensure that the electrical connection line is undamaged.
The unit can be connected to a power optimization system designed to
DIN 18875 with a potential-free contact. The potential-free contact is
used to link the unit to the control.
a
b
Image: Connecting the power optimization system
a Connection terminals for power
optimization system
b Electrical connection line for power
optimization system
Electrical connection line dead
Housing opened
1. Pull the electrical connection line into the unit through the cable
gland.
2. Route the electrical connection line to the connection terminals.
3. Connect the electrical connection line in accordance with the
wiring diagram.
4. Secure the electrical connection line with cable ties.
Installation instructions
c
c Threaded cable connection

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flexfusion electric spacesaver plus team

Table of Contents