Putting the unit into service
8 Putting the unit into service
INFORMATION
Prerequisite Electrical connection made
8.1 Nameplate
8.2 Filling out the Start-up operation report
Information from the nameplate entered?
SN:
E:
Bez:
Item-Nr.:
38
If the unit is not put into service immediately after being connected and the
function check, all inspections must be repeated.
Water connection made
Waste water connection made
Function successfully tested
Housing closed
1. Instruct operator.
2. Fill out the start-up operation report.
a
l
k
Image: Nameplate information
a Manufacturer
b Serial number
c Type number
d Protection class
e Frequency
f Barcode
General information
Typ:
(if listed)
Installation instructions
b
g
j
i
h
g Connection pressure for water
h Year of manufacture
i Type of connection
j Electrical connected load
k Manufacturer's web address
l Certificate
c
d
e
f
Yes
No