Convection Blower - England's Stove Works 55-TRPCB120 Installation & Operation Manual

Hide thumbs Also See for 55-TRPCB120:
Table of Contents

Advertisement

Convection Blower 
 Before beginning any component replacement, be certain the unit is unplugged and 
thoroughly cooled down.  
 Remove the rear panel (using a 
 Detach the convection blower from the wiring harness before going any further. 
 Loosen and remove the (4) 
remove the blower assembly from the stove. 
 Installation of the new blower is performed in reverse of removal; remember to reconnect 
the new blower to the wiring harness. (When installing the new blower, place the blower 
motor opening pointing UP, towards the top of the stove.) 
 
 
 
 
 
IMPORTANT!  READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING CLEANING THE UNIT AS SPECIFIED, AND 
ENGLAND'S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR DUE TO UNSAFE INSTALLATION OR 
 
 
REPLACING COMPONENTS 
5
/
" wrench) and locate the convection blower. 
16
5
/
" screws which hold the blower assembly to the stove; 
16
REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED. 
USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS. 
41 
 

Advertisement

Table of Contents
loading

This manual is also suitable for:

55-shpcb12025-cb12025-ssp01

Table of Contents