Overload Operation - Siemens SIMOCRANE Operating Instructions Manual

Energy storage system management v01.01
Table of Contents

Advertisement

6.2.6

Overload operation

When this setting is selected, the power converter group can be operated in overload mode for
a limited time. The rated current limit can be exceeded as a result. In this operating mode, the
"weakest" power converter in the group (e.g. the one with the highest temperature) determines
the derating factor.
Figure 6-8
SIMOCRANE Energy Storage System Management V01.01
Operating Instructions, 04/2023, A5E51573536B AE
Overload operation
Control and engineering
6.2 Control via remote PLC
79

Advertisement

Table of Contents
loading

Table of Contents