Daikin ERLA11D V3 Series Installer's Reference Manual page 139

Hide thumbs Also See for ERLA11D V3 Series:
Table of Contents

Advertisement

ERLA11~16D + EBVH/X11+16S18+23D
Daikin Altherma 3 R F
4P643602-1B – 2022.05
f Smart Grid pulse meter
1 Install the components of the Smart Grid relay kit as follows:
×2
×4
K1A, K2A Relays
X10M Terminal block
a Screws for X10M
b Screws for K1A and K2A
c Sticker to put on the high voltage wires
d Wires between the relays and X5M (AWG22 ORG)
e Wires between the relays and X10M (AWG18 RED)
B
A
B
2 Connect the low voltage wiring as follows:
A
B
A
B
3 Connect the high voltage wiring as follows:
d
a
K1A
b
c
X10M
b
b
K1A
K2A
1 2 3 4
a
X10M
5 6 9 10
3 4
9
Electrical installation
|
K2A
e
X5M
X5M.4
S4S
X5M.3
1314
X5M
Installer reference guide
139

Advertisement

Table of Contents
loading

Table of Contents