12 SERVICE WORK ON THE CHASSIS
70
–
Tighten screw
Guideline
Screw, top steering
head
V00465-11
–
Tighten screw
Guideline
Screw, top steering
stem
V00465-10
–
Tighten screws
Guideline
Screw, top triple
clamp
–
Secure the wiring harness with cable holder
V00464-11
–
Position the brake caliper, and mount and tighten screws
Guideline
Screw, front
brake caliper
–
Mount the cable tie(s).
–
Position the brake line, wiring harness, and clamp. Mount and
tighten screws
K00546-11
Finishing work
–
Mount the handlebar cushion.
–
Install front fender. (
–
Install the front wheel.
–
Install the headlight mask with the headlight. (
–
Check that the wiring harness, throttle cables, and brake and
clutch lines can move freely and are routed correctly.
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
–
Check the headlight setting. (
4
.
M20x1.5
12 Nm (8.9 lbf ft)
8
.
M8
20 Nm (14.8 lbf ft)
9
.
M8
20 Nm (14.8 lbf ft)
M8
25 Nm (18.4 lbf ft)
bm
.
p. 76)
(
p. 108)
p. 122)
bk
.
bl
.
Loctite
®
243™
p. 121)
p. 73)
p. 63)