Removal of the Electrical Box

Procedure
Step
1. Disconnect the connection
wires.
1
The figure shows the
connection wires.
2
Remove the terminal
board fixing screw.
Remove all screws of the
connection wires to
enable removal.
Remove the screw of the
ground wire.
3
Pull out the terminal board
to open.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Liquid (room A)
Electronic expansion
valve coil
Liquid (room B)
Terminal board fixing screw
Outdoor Unit – 2MXS18GVJU
 The US model has a service
lid on the right side panel.
Remove the 2 screws to
remove the service lid.
Service lid
Gas (room A)
Gas (room B)
Screw
(R10357)
 Match the colors of the
connection wires to A and B
ports as follows.
Power supply
(1) - Black: Power
(2) - White: Power
(3) - Red: Transmission
Earth wire
 The wires are fixed to the
terminal board with screws.
(R10359)
Points
(R10358)