Removal Of Electrical Box - Daikin Floor Standing Type F-Series Service Manual

Inverter pair
Table of Contents

Advertisement

SiBE06-708_A
1.3

Removal of Electrical Box

Procedure
Step
1
Remove the 2 earth
screws.
2
Unfasten the hook and
open the sensor PCB
fixing plate.
3
Remove the front
shield plate.
4
To detach the
connection wires,
remove the 1 screw
from the wiring fixture
and remove the 4
screws from the
terminal board.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Hook
Sensor PCB fixing plate
Earth
screws
Front shield plate
Wiring fixture
Points
(R6781)
(R6782)
Terminal
board
Connection
wires
(R6783)
Indoor Unit
142

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents