Nortel Meridian Companion Installation And Maintenance Manual page 163

Nortel meridian companion: install guide
Hide thumbs Also See for Meridian Companion:
Table of Contents

Advertisement

13.
Enter a Maintenance programming session, reenable the system, and
press ® to exit.
Once the enabling is complete, the Administration Terminal will display
one of the following:
— a Config warning message
— System online
— a Config failure message
14.
Follow the instructions described in the paragraph that relates to the
message displayed.
a. A configuration warning message is normal, and is accompanied by
two options, RESET and RESUME . If M1 programming and rewiring
are complete, press RESUME .
b. System online appears if the M1 reprogramming and rewiring has
been into a new IPE Module and the cards are occupying exactly the
same slots as in the previous module. No action is required; proceed
to step 19.
c. The configuration failure message indicates that the cards have not
been installed correctly (that is, in their original order). Repeat steps
9 through 12.
15.
After pressing RESUME , you will see System startup, followed by
System online . If Base Stations have not been properly reconnected
to the new card slot and TCM device positions, a
Re-Eval required message displays. Follow these steps:
a. Clear the alarm message (see "Responding to event and alarm
messages" on page 139).
b. Rewire as necessary.
c. Restart the system.
Note: Auto Administration does not report missing Base Stations,
only those that have been relocated to a different address. Even
if the Re-Eval required message does not display, it is
important to proceed with the next two verification steps.
Meridian Companion Installation and Maintenance Guide
Maintenance Page 153 of 206

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian companion 1Meridian companion sl

Table of Contents