Hardware installation
April 2020
Figure 3-4: Gas Applications Installation Example
Steam measurement
•
Place tap to the side of the line.
•
Mount the transmitter below the taps to ensure the impulse piping will stay filled with
condensate.
•
In steam service above 250 °F (121 °C), fill impulse line with water to prevent steam
from contacting the transmitter directly and to ensure accurate measurement start-up.
44
Reference Manual
00809-0700-4001
Emerson.com/Rosemount