Processor Unit

The processor unit can be installed on a deck or bulkhead.
Mounting considerations
Select a mounting location, keeping in mind the following points:
• Locate the unit out of direct sunlight and away from heat sources.
• Locate the unit away from places subject to water splash and rain.
• Select a mounting location considering the length of the cables to be connected to
the unit.
• Select a location where shock and vibration are minimal.
• Be sure the mounting location is strong enough to support the weight of the unit.
• Referring to the outline drawings at the back of this manual, allow sufficient space
for maintenance and service.
• A magnetic compass will be affected if the unit is placed too close to the magnetic
compass. Observe the compass safe distances at the front of this manual to prevent
interference to a magnetic compass.
• For the bulkhead installations, secure the unit so that the cable entrance faces
downward.
1.2.1
Deck mount
1. Drill four pilot holes in the mounting location for mounting screws (M6 bolts or
coach screws φ6), referring to the outline drawing at the back of this manual.
2. Secure the unit using the four mounting screws (supplied locally).
Mounting screw
(M6 bolt, coach
screw Ø6
1. HOW TO INSTALL THE SYSTEM
1-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-85 mark-2Fsv-8422-mk2Fsv-8423-mk2

Table of Contents