CARBURETORS
INSTALLATION
NOTE:
After installing all parts, refer to "CABLE ROUT-
ING" in chapter 9, to check the cable, lead and
hose routings.
1. Fasten:
•
Carburetor heating hose 1
NOTE:
Fasten the carburetor heating hose with a clamp
2 at the white mark a.
SEJ7160
2. Adjust:
•
Starter cable freeplay
Refer to "STARTER (CHOKE) CABLE
FREEPLAY ADJUSTMENT" in CHAPTER 2.
3. Bleed:
•
Cooling system
Refer to "COOLING SYSTEM" in CHAPTER
2.
7-9
CARB